Enquiry

PIPE SPOOL FABRICATION

    PIPE SPOOL FABRICATION ORDER

    Document No.

    Project / Turnaround No.

    Requested By

    Date Issued

    Priority

    Revision

    Plant / Unit

    Discipline

    Required On Site Date

    Status

    MATERIAL & FABRICATION STANDARD

    Pipe Material

    Pipe Material Grade

    Fabrication Standard

    Flange Facing

    Design Temperature (°C)

    Operating Temperature (°C)

    Fluid / Service

    Type

    Flange Material

    Pressure Rating

    SCH

    Design Pressure (barg)

    Operating Pressure (barg)

    Others

    INSPECTION, TESTING & PRESERVATION

    NDE Method

    PMI Required

    Preservation on Delivery

    Hydrotest Pressure (barg)

    Painting / Coating

    Drawing attached : YES/NO

    Attach :

    Remarks / Special Requirements

    Name

    Contact Number

    Email Address